Bridge #241 on CR 32 over the Nunemaker Ditch

Past Projects

Summary: Replacing three existing 66″ diameter x 60′ corrugated metal culverts that are 47 years old and deteriorated with two 84″ x 90′ corrugated culverts.

Design: Elkhart County Highway

Cost Estimate: $90,000