Bridge #152 - Mishawaka Road over Yellow Creek

Current Projects

Location: Between US 33 and Minuteman Way

Designed by: Lochmueller Group

Contractor:  Milestone Contractors

Construction Start Date:  2022

Completion Date:  2023

Estimated Cost: $3,000,000

Funded by: 80% Federal, 20% Local

Project Summary: This bridge is structurally deficient as a result of beam deterioration but does not have a weight limit. The bridge will be completely replaced as part of the work. The work will be performed using partial width construction so that 2 lanes of the 4-lane road will be open at most times during construction.